The work behind an AI product needs its own project description: the unresolved problems, the approaches tested and the evidence that explains why the engineering was necessary.Â
AI infrastructure deserves a place in development planning as soon as a product feature depends on several technical problems being solved together. An assistant may be the visible result. But the work underneath it needs to be understood separately: what does an existing model provide, what can be integrated, and what does the team still need to develop?Â
For engineering leaders, that distinction matters when allocating capacity, explaining a budget or preparing a funding assessment. It is not an invitation to describe every software adjustment as research. It is a reason to make the actual development work visible.Â
The model is only part of the projectÂ
Igniteâs software trend report identifies agent orchestration, conversation-state management and evaluation as engineering tasks in their own right. It also describes work on retrieving and preparing the information an application uses to answer questions. Development therefore takes place around the model as well as within it. (Source: Ignite software trend report, Trend 1, âAgentische Systeme im Produktionsbetriebâ, âRAG als Kerninfrastrukturâ and âKI-Evaluation und Observabilityâ.)Â
The project structure should reflect that distinction. A product feature describes what a user can do. An engineering work package describes the problem that must be solved to make it possible.Â
A reliable handover between AI components is a different task from designing the assistantâs interface, even where both contribute to the same release. Give each task an appropriate scope, owner and account of the work involved.Â
Otherwise, a roadmap entry such as âlaunch the assistantâ leaves too much unexplained.
The finished architecture does not tell the whole storyÂ
An architecture diagram shows how components are intended to work together. A development record should also explain why the team chose that arrangement and what remained uncertain at the outset.Â
The trend report describes the choice between adapting a smaller model and accessing an external model as a decision without a universally correct answer. (Source: Ignite software trend report, Trend 1, âFine-Tuning, Destillation oder Frontier-Modell per APIâ.)Â
For decisions of this kind, record the starting conditions. Identify the requirements, the approaches investigated and what the comparison revealed. Include a rejected approach where its results materially influenced the next development step.Â
Not every difficult decision represents technical uncertainty, however. A price negotiation, an outstanding approval and a lack of team capacity are different problems. Describe them accurately rather than folding them into a general claim that the engineering was complex.Â
The technical explanation should identify the behaviour the team could not yet achieve or sufficiently understand.
Capture the development while it is happeningÂ
Use the work already under way as the starting point for documentation. A practical project description should cover five areas:Â
- The unresolved problem. Explain what the team did not know how to solve at the beginning. âBuild an AI assistantâ is too broad.Â
- The relevant constraints. Record the requirements for data processing, response quality, latency and deployment that genuinely restrict the choice of solution.Â
- The approaches investigated. Include discarded options and the observations that led the team to reject them.Â
- The supporting material. Connect work packages to architecture decisions, test results and relevant entries in the development backlog.Â
- The product context. Explain which product capability depends on the work and what falls outside the project.Â
This is a structure for a coherent development record, not a complete evidence checklist for a particular funding programme. Any additional requirements need to be established separately.Â
The aim is to preserve the reasoning behind the engineering, rather than merely collect documents that happen to mention the project.Â
Documentation needs an ownerâand timeÂ
An engineering team approaching a release deadline may have little capacity for a funding application. An additional documentation request without an owner or an allocation of time does not resolve that problem.Â
Start by identifying what information already exists. Then agree who will assemble it, who will answer technical questions and who will check the description for inconsistencies.Â
The preparation can be handled by someone other than the developers. The technical account still needs their involvement. In particular, they should confirm what was uncertain, what was tested and what the results actually demonstrated.Â
Set a practical point for updating the record, such as the completion of an experiment or a material architecture decision. Avoid creating a second task-management system alongside the first.Â
This work takes time. Existing engineering records are a useful starting point, not a promise that an application will require no additional effort.Â
Assess funding without rewriting the engineeringÂ
The trend report identifies Germanyâs Forschungszulage and the Netherlandsâ WBSO as potential instruments to investigate. It also includes Germanyâs Central Innovation Programme for SMEs, ZIM. These are starting points for programme selection, not findings that a particular AI project qualifies. (Source: Ignite software trend report, âWohin strategisches Kapital flieĂt: Programme und Konditionenâ.)Â
Begin with the actual project. Then assess which instrument might fit the company, the work and its timing under the applicable conditions. Forschungszulage and WBSO need separate assessments; a shared technical description does not make their requirements interchangeable.Â
Custom development is not, by itself, a sufficient funding argument. Explain why the available approaches did not meet the requirements and how the team investigated the unresolved technical questions.Â
A funding assessment should evaluate that work. It should not construct a different development story after the event.Â
StatementÂ
AI infrastructure needs a project description that makes its engineering substance understandable. A clear distinction between the initial problem, the approaches investigated and the results creates a stronger basis for internal decisions and a subsequent funding assessment.
Put one AI work package under reviewÂ
Choose a current piece of custom development and bring together its task description, architecture decisions and test results. Identify the missing connections. That gives you a concrete starting point for a discussion with Ignite about which funding questions should be assessed next.
Become a partner of Ignite Group today.
In a short call, we check which funding programmes fit your project.
Learn more: Become a partner of Ignite Group today.